Kings Gardens, London NW6
Back to case studies

Kings Gardens, London NW6

  • Client, Kings Gardens Freehold Ltd / Lift Consultant, Ardent Lift Consultancy
  • Complete refurbishment of 4 existing traction passenger lifts. Approx. contract value £250k
  • Asbestos removal from existing lift shafts.
  • Works included removal of the existing manual landing gates, installation of power operated lift doors and remedial building works including final decorative finishes to each landing.  
01708 744700
Get online quote