We recently completed a project in Haymarket, London.
This site posed many challenges, in particular the logistics of delivering and removing materials to and from site. This was managed impeccably by our project team.
The new lift installation is an GLE/IMEM package with a DAC Controller, Ziehl Abegg machine and Wittur doors.
5 Stops, 6 persons, 450kg lift capacity