Haymarket, London
We recently completed a project in Haymarket, London. This site posed many challenges, in particular the logistics of delivering and removing materials to and from site. This was managed...
View this case studyTake a look at some of the quality work we’ve done already!
We recently completed a project in Haymarket, London. This site posed many challenges, in particular the logistics of delivering and removing materials to and from site. This was managed...
View this case studyWe recently completed a project that consisted of installing 2 new lifts in Old Street, London, working with Elevate Consulting and Wates Group. Top drive Traction Passenger Lift 630kg, 8...
View this case studyNew lift installation for the University of Arts at Elephant & Castle. The lift is now fully completed within programme and budget. We have had a fantastic outcome and very happy...
View this case studyA recent Hydraulic Passenger Lift Refurbishment completed working with Ardent Lift Consultancy. The projects team accomplished an early finish to program, leaving a very satisfied client. 6...
View this case studyA recent back to guides refurbishment completed successfully at Wigmore Street! 10 stop lift, 630kg, 8 persons, 1.6m/s The project was handed over to the client on time and within...
View this case studyOur in house repairs department recently carried out a health and safety upgrade on this scissor operated bin lift. Which included replacing the existing “Kee Clamp” gate with a new solenoid...
View this case studyA newly installed machinery directive cabin lift in an East London council chambers building. A fantastic outcome on this sensitive site. Thanks to our in house project management team, building...
View this case studyOur major projects team recently completed the full refurbishment of a 21 person goods lift at M&S in Romford, Essex. The project was a great success and completed within program. Only the...
View this case studyLift Consultant, W. Jennings & Associates Ltd Installation of 1 new lift into an existing lift shaft. Completed February 2020. Bespoke traction lift utilising the existing lift...
View this case study